Turning the island's waste, Sargassum and scrap tires into power, fuels and recovered materials, on existing industrial land and infrastructure at Port Hamilton.
Planning figures from preliminary studies; all volumes to be verified in Step 1.
St. Croix lands Sargassum on its beaches, buries its waste in a nearly full landfill and imports almost all of its energy. Project Phoenix brings these problems to one site, where they become each other's solutions.
Municipal waste, food waste, wood and yard waste, scrap tires and petroleum coke have been tested. Sargassum and distillery wastewater are still to be tested; figures below are planning assumptions.
Material arrives by sea and road, is prepared, converted and refined into energy and saleable products. Scroll through the journey, stage by stage.
Each unit keeps its own vendor controls and independent safety shutdown. A campus control center ties them together over a secure, zoned network.
Technology-neutral. Open industrial standards, so whichever technologies win testing plug in.
Safety stays local. Unit safety systems act independently of the central platform.
Energy dispatch. Balances biogas, syngas, solar, battery and data center load in real time.
Feedstock routing. Tracks every load from receipt to process.
One source of record. Emissions, performance and gate-fee data from one store.
Built for growth. Reserved capacity lets new units connect without redesign.
Utility-scale solar and hurricane-resilient wind sit beside the campus's own biogas and thermal generation, all dispatched from one control center.
Solar, wind and battery storage join the campus's own biogas and thermal generation on a microgrid, giving the island resilient power and backup through storms.
Reliable on-site power makes the campus a natural home for secure, resilient digital infrastructure.
An operations center with control room, laboratory and training, and a project office for partners, stakeholders and visitors.
November 2026 to October 2027. Municipal waste, food waste, wood and yard waste, scrap tires and petroleum coke have already been tested. Step 1 completes the remaining tests, led by Sargassum, and builds the Master Plan on the results. A go / stop decision on Sargassum comes at month six.
Two vendor campaigns, one plasma gasification and one pyrolysis, run each solid feedstock back to back under one test protocol, so results compare like for like. Municipal waste, food waste, wood and yard waste, tires and coke are done; Sargassum and distillery wastewater are next. Wet streams go to digestion. Most testing will happen at mainland laboratories and vendor facilities.
| Feedstock | Plasma | Pyrolysis | Digestion |
|---|
Select any image to enlarge.
Project Phoenix is prepared by Global Bridges Group. We welcome conversations with government agencies, industrial partners, technology providers and investors.